The restoration site - post restoration. Here the site is seen on an outgoing
tide. The restoration increased the tidal range of the upstream side of the
creek so that it was roughly equivalent to the downstream side.
The culvert measured approximately 5' x 8' and was designed to provide
appropriate hydrologic conditions to increase productive fish habitat.
|